Hotel Facilities
  Back to Portfolio Start Page   Go to Home Page Services Page Company History Contact Information

 

 

Sheraton Hotel Galerias Monterrey
Monterrey, Mexico

Client: Luis Montemayor, Hotel Monterrey

Alpaca provided the mechanical engineering for the HVAC systems on this significant project.This new hotel has 12 stories and a service basement.

The HVAC system used water-source heat pumps in all areas. All guest room units were the stacked, wall-mounted type, each having individual cooling controls. The central cooling towers, boilers and pumps were located on the roof. The total system provides 600 tons of cooling.

  >Completed
 
 
 

Hotel Centro
Monterrey, Mexico

Client: Luis Montemayor & PMP Consultores

Alpaca provided the design and mechanical engineering for the HVAC systems on the hotel portion of the project. The hotel is part of a major new shopping mall complex. This new hotel has 14 stories plus two basement parking levels. The guest room units are air conditioned using the stacked, wall-mounted type water source heat pumps, each having individual cooling controls. The central cooling towers, boilers, and pumps were located on the roof. The total system provides 600 tons of cooling.

Alpaca also provided peer review of the Mall facility HVAC systems for the client.

 






 > Construction Pending  
 
 
Copyright © 2003-2005 Alpaca Energy Solutions, Inc. All Rights Reserved.