| |
| |
|
Lakehills
Church
Austin, Texas
Client:
Overland Partners Architects - San Antonio
Located
in the Barton Creek area, west of Austin, this 1,500-seat
auditorium building is the second phase of a multi-building
development for this congregation. Alpaca provided
full MEP and fire-protection engineering design services
on this facility.
The building utilizes chilled and hot water for the
HVAC systems, with special consideration for sound
attenuation due to the high level audio/visual use
in the auditorium. The electrical system is designed
to support the standard lighting and power systems,
along with the special lighting requirements. The
construction costs were $3.5
million for the facility. |
|
|
|
Emmaus
Catholic Church
Lakeway, Texas
Client:
Tackett-Lodholz Architects, Inc. - Houston
Alpaca
performed all mechanical, electrical, plumbing, and fire-
protection design engineering for this $6.5
million facility including the sanctuary and
all site development. The design aspect required a high level
of attention to sound attenuation, special interior and exterior
lighting effects, and high-volume air conditioning for the
large auditorium setting.
|
|
|
|
| |
|
Katy
Church of Christ
Katy, Texas
Client:
Tackett-Lodholz Architects, Inc. - Houston
This expansion
of an existing facility provided for a new auditorium and
sanctuary, additional classrooms, and new office areas - with
special attention to cost-effective design and construction
for mechanical, electrical, plumbing, and fire protection
systems.
|
|
|
|
| |
Emmaus
Family Life Center
Lakeway, Texas Client:
Tackett-Lodholz Architects, Inc. - Houston
As the second phase of this significant building project for
the parish, the Family Life Center included twenty classrooms
and a combination recreation area / auditorium. Energy recovery
systems were utilized to save energy on the large volumes
of ventilation required for the educational areas. |
|

|
|
| |
The
Strawbridge Sanctuary at the
United Methodist Church
Kingwood, Texas
Client:
Tackett-Lodholz Architects, Inc. - Houston
This new
sanctuary building, with seating for 600 people, included
a new 4,000 amp electrical service to serve the existing church
complex, as well as the new sanctuary.Due to high humidity
conditions for this location, an energy recovery system was
used on the outside air makeup. |
|

|
|
| |
|
St.
Peters United Methodist Church
Katy, Texas
Client:
Tackett-Lodholz Architects, Inc. - Houston
Project
included major renovations of existing facilities, the design
of a new mechanical courtyard to re-feed existing buildings
from the central plant, and removal of existing DX equipment.
Project also included approximately 30,000 sq. ft. of new
construction, in addition to the installation of six modular
buildings on adjacent property. |
|

|
|
| |
|
Graeber
Road Church of Christ
Rosenburg, Texas
Client:
Tackett-Lodholz Architects, Inc. - Houston
This project
involved the expansion of an existing facility. Alpaca provided
MEP services for the new auditorium addition and the remodel
of the existing auditorium into a fellowship hall with kitchen
facilities. Adjacent classrooms were also remodeled.
|
|

|
|
| |
|
| |
|
| |
Copyright
© 2003-2005 Alpaca Energy Solutions, Inc. All Rights Reserved. |
|